Cancer Centre at Guy’s Hospital

Address

Great Maze Pond, London SE1 9RT

Local Authority

Guy’s and St Thomas’ NHS Foundation Trust

Storeys / height

14 storeys; height in metres not found

Cladding

Owner / Landlord

NHS

Original design architect

Rogers Stirk Harbour + Partners, with STANTEC as healthcare architect

Opened September 2016; NEC contract, not PFI

Remediation ref/date

Remediation lead

Litigation

-

  • (Master ACM building list) ACM CONFIRMED. Trust statement 09/08/2017: ‘we identified rain screen panels on the new Cancer Centre at Guy’s which we suspected included composite m
  • (CM CONFIRMED. Trust statement 09/08/2017: ‘we identified rain screen panels on the new Cancer Centre at Guy’s which we suspected included composite materials’ and ‘The panels in question make up only 15% of the total surface area of the building and cover insulation on concrete columns and floor slabs’ (https://www.guysandstthomas.nhs.uk/news/fire-safety-guys-and-st-thomas).
  • Southwark News 13/11/2022 is explicit: ‘The affected panels covered 15 per cent of the building and contained a kind of aluminium composite material (ACM) associated with the Grenfell fire’.
  • Dezeen 26/09/2016 credits RSHP as architect ‘in collaboration with Stantec (healthcare specialists)’ (https://www.dezeen.com/2016/09/26/rogers-stirk-harbours-cancer-treatment-centre-london-guys-hospital/); corroborated by the trust’s own ‘Richard Rogers lays foundation stone for new Cancer Centre’. Main contractor Laing O’Rourke, 160m. Engineer Arup, who also acted as the trust’s post-Grenfell reviewing fire engineer. ACM removed from the north side 17/10/2022, west and south after - five years from discovery to completion
  • NHS trust: Guy’s and St Thomas’ NHS Foundation Trust