## Description
*Comprehensive redevelopment of the Brook House (former Cannon Rubber Factory site), including the erection of a 22 storey building (plus a part top floor mezzanine) providing 100 residential units (use class C3) and 190 sqm of commercial floorspace (use class B1, D1 and D2), two buildings of 6 and 9 storeys respectively providing 101 residential units (use class C3) and a part 2/part 5 storey building comprising a 2,388 sqm 2 form entry primary school (use class D1) and 21 residential units (use class C3), together with associated car and cycle parking, refuse stores, highways, infrastructure, open space and landscaping works.*
Original design architect

West Elevation 11594 - 307 PL03.pdf

South Elevation 11594-308-PL02.pdf

Links
- HGY/2012/2128 Full planning permission
- HGY/2013/0487 Approval of details reserved by a condition
- Features in Kingspan’s Routes to Compliance: KIN00003148
“In order to meet the energy requirements of the London Plan we used a fabric first-approach in combination with a district heating plant. Kingspan Kooltherm® K15 Rainscreen Board met the fire performance requirements for the high level buildings and helped us to achieve the target U-values across the properties without eating into the indoor living space of residents.”

source: KIN00007769 Day 84 - 8 December 2020 - Adrian Pargeter (Kingspan)