Building / block / estate

Apex House (trading as Scape House)

Address

Fulton Road, Wembley HA9 0TF

Local Authority

Brent

Storeys / height

Cladding

ACM. 29 storeys and 82m as built; the 2016 consent was for a ‘part 8-, part 9- and part 28-storey building comprising 558 student accommodation units’. Was the tallest volumetric building in Europe on completion
2017, twelve months on site. Developer Tide (with Gravis REIT; Scape is the operator brand). Contractor Tide Construction, volumetric modules by Vision Volumetric. Brent ref 15/4708

Owner / Landlord

Original design architect

HTA Design LLP

15/4708, Brent Planning Committee 09/05/2016; completed 2017

Remediation ref/date

23/2465 - Approved 9/10/2023

  • CERTIFICATE OF LAWFULNESS OF PROPOSED USE OR DEVELOPMENT (CLOPUD)
  • The proposed works which form part of the CLOPUD application relate to replacing all ACM metal cladding with PPC metal cladding across the elevations. The materials legend on the proposed drawings shows which panels are subject to change.
  • It is considered that these works do not materially affect the overall external visual appearance of the building and therefore planning permission is not required. To ensure the visual appearance is not affected, the proposed PPC cladding has been colour matched to the existing ACM panels. On the basis that planning permission is not required, a Certificate of Lawfulness of Proposed Use or Development (CLOPUD) to secure the Council’s formal “judgement” is sought.

Remediation lead

n/a - the ACM was original

Litigation

-

  • (Master ACM building list) ACM. 29 storeys and 82m as built; the 2016 consent was for a ‘part 8-, part 9- and part 28-storey building comprising 558 student accommodation units’
  • (ACM 18m plus) HTA’s own project page; Tide Construction project page; Buildington; Brent democracy record; Brent planning record via the PlanIt national ACM search
  • Confidence: HIGH, four independent sources. The applicant’s agent on 15/4708 was Simon Bayliss of HTA. Developer Tide with Gravis REIT; Scape is the operator brand. Contractor Tide Construction, modules by Vision Volumetric. NOTE the building is APEX HOUSE; Scape House is the postal and operator name, postcode match exact
  • Workbook source(s): Master ACM building list (row 29); ACM 18m plus (row 29)

Additional corroboration (Practices tab)

  • HTA Design LLP - ORIGINAL design architect
    Basis: HTA’s own project page and Tide Construction’s; Simon Bayliss of HTA was the applicant’s agent on Brent 15/4708. HTA are already in this dataset as the overclad architect at the Chalcots Estate
    (Practices tab, row 22)