Building / block / estate
8 Artillery Row
Address
8 Artillery Row, London SW1P 1RZ
Local Authority
Westminster
Storeys / height
Cladding
Phenol formaldehyde (phenolic) insulation; polystyrene producing droplets of molten polymer; missing cavity barriers behind the red brick facade; Massaranduba timber decking on treated pine subframe to balconies and roof terraces; exposed Kingspan Kooltherm and combustible plywood roof lining at the 9th floor plant room. EWS1 rated B2
Owner / Landlord
Avon Ground Rents Ltd
Original design architect
Make Architects (competition won 2012; reconstruction 2014 or 2015; 22 apartments). INFERENCE from matching descriptions - the FTT names no original architect. Project page
Original consent ref/date
-
Remediation ref/date
LON/00BK/BSA/2024/0004
Remediation lead
AFL Architects (appointed circa 2021) and HYDROCK (Technical Design Note 25/06/2021). Watts Group project manager from 14/04/2021
Make Architects (the conversion IS the external wall)
Litigation
Remediation order against Avon Ground Rents Ltd, 13 leaseholder applicants. TRIBUNAL CRITICISED AFL: they did not inspect the building or commission scale plans and relied on client information and planning drawings containing inaccuracies. Hydrock flagged that the best achievable was a B1 and recommended a survey that was never done
Source / Evidence / Links
- LON/00BK/BSA/2024/0004 FTT decision 18/11/2024
- https://www.buildington.co.uk/buildings/4004/england/london-sw1p/4-16-artillery-row/8-artillery-row
- AFL Architects - REMEDIATION ARCHITECT - NOT original
Basis: Now FIVE buildings, all remediation. At 8 Artillery Row the FTT CRITICISED them: appointed circa 2021 to draw detailed remedial plans, they did not inspect the building or commission scale plans and relied on client information and planning drawings containing inaccuracies. A cautionary precedent on remediation scope - Make Architects - ORIGINAL ARCHITECT
- Hydrock - REMEDIATION fire and technical design - NOT architects
Basis: Technical Design Note 25/06/2021 flagged that the penthouse external walls contained combustible materials and that the best outcome achievable was a B1, recommending a further survey that was not undertaken - Bell Building Projects - REMEDIATION contractor