Cladding

ACM (Reynobond, CGL Systems). CRITICAL: the ORIGINAL envelope was an aluminium rainscreen with double glazed windows and, per the judgment, ‘did not give rise to any material fire risk because the aluminium panels were made of solid aluminium rather than ACM with a PE core’. 16 storeys, 42.5m, 210 bedrooms

Owner / Landlord

Original design architect

NOT FOUND - and it does not matter. Contracted 2001 with Jarvis Construction as building contractor for a purpose-built hotel; operating 2002. The original wall never carried ACM

2001 contract

Remediation ref/date

Remediation lead

NO ARCHITECT IN THE ACM CHAIN. Waterman Partnership, Essendi’s engineering consultants and ‘professional design consultants’, recommended complete replacement of the panels and ran the procurement. WEATHERWISE took a JCT design and build contract as a deed on 23/05/2005 ‘for the completion of the design and the supply and installation of replacement cladding’. CGL Systems supplied the Reynobond. PC 26/05/2006

Litigation

Essendi UK Hotels 2 Ltd v London Property Company Ltd [2026] EWHC 1354 (TCC). Para 56: ‘There is no suggestion that a fire safety engineer was instructed, either in relation to the original construction works or the cladding contract works.’ Note also that the west elevation abutting Mahatma Gandhi House up to 10th floor slab was deliberately left unclad and sealed with flashing